ASNR Report 2025

LES ACTIVITÉS NUCLÉAIRES : RAYONNEMENTS IONISANTS ET RISQUES POUR LA SANTÉ ET L’ENVIRONNEMENT BNI 72 ZGDS BNI 153 Chinon A2 BNI 74 Saint-Laurent silos BNIs 45, 46, 133, 161 Bugey 1 St-Laurent A1 and A2, Chinon A1, Chinon A3 CEA Saclay OPERATION AND DESCRIPTION CHALLENGE NEXT KEY STEPS ASNR OBSERVATIONS Retrieval and packaging of drums containing a mixture of waste and fragments of fuel (EPOC project) Safety of the storage areas with respect to containment and a seismic hazarde • Construction of retrieval equipment • Adaptation of the retrieval equipment, whatever the envisaged state of the waste • The first drum will be lifted in a few years’ time, and treatment of the first EPOC drums is planned to start in 2037 • The end of decommissioning is scheduled for 2059. • Commissioning of the retrieval equipment was initially scheduled for 2023. This deadline was pushed back several decades due to numerous technical and organisational difficulties. This commissioning deadline must be consolidated owing to the need to repeat the studies already carried out. In a few years’ time, CEA plans to lift the first drum for retrieval and packaging. Retrieval and packaging of all solid waste, fuels and irradiated fuels and radioactive sources 40 pits zone – Removal of stored irradiated waste (end scheduled for 2030) • The removal from storage of blocks 108 and 116 was completed in 2022, and the removal from storage of the spent fuel in the pool was completed in 2024. CEA has also completed the removal from storage of the main sources in building 116. • With regard to the removal from storage of irradiated waste, in view of the many technical and organisational difficulties, the initial deadlines were postponed for several years. EDF OPERATION AND DESCRIPTION CHALLENGE NEXT KEY STEPS ASNR OBSERVATIONS Decommissioning of the reactor vessel “Pilot” project for the decommissioning of the other GCRs • Opening of pressure vessel and installation of the decommissioning platform • Decommissioning of the graphite stack • Removal of the fuel from the facility has significantly reduced the risks. The facility has moreover already been partly decommissioned. • ASNR will take a position statement on the deadlines presented by EDF for decommissioning of its GCRs, as part of the review of the decommissioning files submitted at end of 2022. Decommissioning of the reactor vessel is currently scheduled to begin around 2033. The overall decommissioning time communicated by EDF is estimated at 50 years. Placement and maintenance in a secure configuration of the reactor vessels Conservation of reactors pending Operating Experience Feedback for the Chinon A2 pilot project • End of decommissioning excluding pressure vessel • Maintenance and repair work to ensure the durability of reactor buildings • Removal of the fuel from the facility has significantly reduced the risks. The facility has moreover already been partly decommissioned. • ASNR will issue a position statement on the deadlines presented by EDF for decommissioning its GCRs, as part of the review of the decommissioning files submitted at end of 2022. The duration of the secure configuration work is estimated at approximately 10 to 25 years according to the reactor. Total decommissioning time is estimated at over 50 years. Retrieval and packaging of the graphite sleeves Construction of a new storage facility that meets current safety standards Construction of the new storage building and of the retrieval and packaging equipment ASNR will issue a position statement on the safety of the new storage facility project as part of the review of the decommissioning file submitted in 2022, an update of which is currently being carried out by EDF following the refinement of the scenario. 348 ASNR Report on the state of nuclear safety and radiation protection in France in 2025

RkJQdWJsaXNoZXIy NjQ0NzU=